Description
Features
Reviews
Suitability:
Concrete, solid bricks, aerated concrete, limited for perforated bricks and hollow blocks
Properties:
Optimal screw guidance due to rib-shaped internal geometry, fire-safe pipe fastening in accordance with technical guidelines for gas pipe installation (TRGI 3.3.7.2.), with aerated concrete G2 and G4 the dowel can be driven in without pre-drilling.
Features
No reviews yet — your comment may be first.
All reviews 0